The construction and installation of prefabricated direct-buried PE-RT Type II heating pipelines must strictly adhere to current standards, including the *Code for Construction and Acceptance of Urban Heating Network Engineering* (CJJ 28) and the *Technical Specification for Direct-Buried Hot Water Heating Pipelines in Urban Areas* (CJJ/T 81). Implementation should also incorporate relevant product standards, design documents, and local regulations. Prior to construction, the contractor must survey the horizontal position and elevation of the pipeline in accordance with the design. In coordination with the project owner and the supervision unit, the contractor shall verify the pipeline route and the locations of existing underground utilities and structures-conducting localized exploratory excavations if necessary-and prepare a construction organization plan, which must be approved through the prescribed procedures before execution. Management personnel must be certified following an assessment and must be familiar with the design/construction drawings as well as the requirements for coordination with other trades. Operational personnel must undergo training to ensure they understand material properties, key operational procedures, and safety protocols.
Regarding material procurement and on-site management, all pipes and fittings must comply with national product standards and be accompanied by quality inspection certificates from the manufacturer. Before storage or installation, the material, specifications, model, and physical condition of the components must be inspected; any products showing signs of damage must not be used. In cases of dispute or specific design requirements, technical evaluations or re-inspections must be conducted; substandard materials are strictly prohibited. In areas with high groundwater levels or during the rainy season, measures for dewatering and drainage must be implemented to promptly remove any accumulated water from the trenches. When construction takes place along roadways or sidewalks, safety barriers, clear warning signs, and nighttime warning lights must be installed. Pipeline connections should preferably be performed alongside the trench; for specific sections, connections may be made at the bottom of the trench, provided that adequate working pits are excavated. Small-diameter pipes should generally be joined using electrofusion socket connections, while large-diameter pipes should be joined via butt fusion. Welders must hold valid certifications and strictly follow the established, qualified welding parameters. Upon completion of a connection, the quality of the joint must be inspected in accordance with the requirements provided in the appendix; any substandard joints must be reworked and re-inspected. At the end of each workday, the open ends of any partially installed pipelines must be temporarily sealed, and any exposed insulation layers must be waterproofed at the ends. Insulation of pipe joints shall be performed only after the working pipes have passed strength tests, the trench is free of standing water, and weather conditions are dry (i.e., no rain). The insulation layer must be tightly fitted with no gaps. Following the installation of the outer protective layer, a complete airtightness test shall be conducted; for secondary pipe networks, at least 10% of the field-installed joint seals shall be subject to random inspection. Before cutting or performing hot work on a pipe, the insulation layer within 150–250 mm of the intended cut site must be removed, and appropriate fire-prevention measures must be implemented. Once pipe installation and joint insulation are complete, the system shall undergo hydrostatic testing and flushing, with test parameters adhering to the CJJ28 standard and project design specifications. Backfilling shall commence only after the "hidden works" (underground/concealed components) have passed inspection. The space from the bottom of the pipe to 300 mm above the top of the pipe shall be filled with fine sand or native soil (free of debris). Backfilling must be carried out symmetrically from both sides of the pipe, ensuring that the height difference between the two sides does not exceed 200 mm; the material shall be compacted in layers to meet specified compaction requirements. Throughout the entire construction process, strict adherence to technical standards, approval procedures, personnel qualification requirements, material inspections, connection quality control, joint sealing, pressure testing, backfilling protocols, and on-site safety measures must be maintained to ensure the safety and reliability of the heating pipeline system.